MPCB LICENSE CONSULTANT — MAHARASHTRA 

List

MPCB License Consultant in Maharashtra — Consent to Establish, Consent to Operate & Renewal

The Maharashtra Pollution Control Board (MPCB) regulates industrial pollution across Maharashtra under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981. Any industry that discharges effluents into water or emits pollutants into the air must obtain MPCB consent before starting operations.

100%

Satisfied Client

Delivering trusted financial solutions with complete client satisfaction guaranteed.

MPCB License Consultant in Maharashtra

Shraddha Management Consultancy Pvt Ltd provides complete MPCB consent services — Consent to Establish (CTE), Consent to Operate (CTO), annual renewal, hazardous waste authorisation, and e-waste authorisation — for industries across Maharashtra. We have extensive experience with MPCB applications in Pune's MIDC areas, Navi Mumbai industrial zones, and across all Maharashtra districts.

AT-A-GLANCE

• Governing Authority - Maharashtra Pollution Control Board (MPCB)
• Types of Consent - CTE (Consent to Establish) and CTO (Consent to Operate)
• Industry Categories - Red (highly polluting), Orange (moderately polluting), Green (low polluting)
• Hazardous Waste - Separate authorisation required under HW Rules
• CTO Renewal - Annual renewal for most categories
• Portal - Applications filed on MahaOnline / MPCB portal
• Processing Time - CTE: 30 to 60 days | CTO: 30 to 45 days

• Our Coverage - Pune, Navi Mumbai, all Maharashtra MIDC areas

//_Step by Step Process_//

CTE vs CTO Comparison Table

AspectConsent to Establish (CTE)Consent to Operate (CTO)
When RequiredBefore starting construction of the industrial unitBefore commencing production or operations
PurposeEnvironmental clearance for setting up the unitOngoing operational clearance for running the unit
Who IssuesMPCB Regional OfficeMPCB Regional Office
Validity2 to 5 years (depends on project)1 to 5 years (category-based)
ApplicationFiled with DPR and project detailsFiled after CTE, before operations start
//_Step by Step Process_//

Documents Required for MPCB Licence

Form

Online Application Form on MahaOnline Portal

Project Report (DPR)

Detailed Project Report (DPR) — for CTE

Site plan

Site Plan Showing Factory Location and Surroundings

Layout plan

Layout Plan of the Unit Showing Machinery and Process Flow

Pollution control measures plan

Pollution Control Measures Plan (ETP, STP, emission control)

Lease documents

Land Ownership or Lease Documents

NOC

NOC from Local Authority (Municipal Corporation / MIDC)

Products List

List of Raw Materials and Products

Fuel

Water and Fuel Consumption Details

Waste Generation Details

Solid and Liquid Waste Generation Details

Proof of Pollution Control

Proof of Pollution Control Equipment Installation (for CTO)

Environment Statement

Environment Statement (annual filing, for CTO renewal)

Find clear, practical answers to common questions, helping you decisions faster.